RNH homeowners* are responsible for maintaining the appearance of their individual home consistent with the original architectural and environmental character of the community. No changes to the exterior design of any home may be undertaken without the written approval of the RNH Board. Exterior materials must be compatible with the architectural design character of the community and are detailed in the Building Specifications for each cluster.
*RNH homeowners are ultimately responsible for the condition of their home in the RNH community and compliance with RNH Rules & Regulations. While residents and tenants must also comply with all RNH Rules & Regulations, only the term homeowners will be used in the following sections.
The Building Specifications detail the approved specifications—color and manufacturer—for home exteriors. In some instances, manufacturers and colors may change, and the A&E form process protects RNH homeowners from installing incorrect colors that result in costly replacement. Homeowners must seek written approval at least ten (10) days prior to beginning work.
- Call Continental Property Management, Inc., at 215-343-1550 to ask for an Architectural & Environmental (A&E) form. (Use the link to print from website).
- RNH homeowners (not contractors) must submit the form, a sample of the material, and the manufacturers’ name and color for signed RNH Board approval.
- RNH homeowners then receive a letter confirming the Board’s approval.
Making exterior changes without prior A&E form approval may result in action that devalues and/or detracts from the community, and, ultimately, may result in costly corrections and fines for the RNH homeowner. Homeowners who do not obtain signed approval, and the wrong color material is used, will be required to remove/correct the violation.
Exterior changes requiring A&E form approval include, but are not limited to:Roofs, siding, stucco, and cap painting/replacement and repair.
- Doors and windows, including storm doors and garage doors.
- Decks, driveways, sidewalks, walkways, steps, and patios.
- Retaining walls, landscaping ties, fencing, and recreational equipment.
- Plantings that will be more than five (5) feet tall at maturity.
- Landscape changes, such as adding/extending beds and landscaping lights.
- Satellite dishes (NOTE: All dishes/antennae must be placed at a discreet location to be minimally visible to foot or vehicular traffic. See satellite dishes and antennae.)
RNH homeowners wishing to make exterior changes to their home are required to present their A&E form request to the management company for RNH Board review and approval.
RNH homeowners must include any appropriate plans, drawings, engineering studies, samples, and appropriate township approvals/permits with the original A&E form request.
Within thirty (30) days after completion of any building project, all building materials and debris must be cleared from the property, and excavations must be back filled and returned to original grade.